With Cyljet, our team provides you with support and advice on Jet-Grouting operations:

  • For quick checking of column dimensions
  • To ensure that only the required amount of material is used
  • To optimize worksite costs and schedules

An Exclusive Solution Developed by Sixense

Multiple benefits

  • Significant optimization of operational costs:
    Cyljet enables injection parameters to be calibrated to the highest level of precision
  • A robust and proven method:
    Removes the need to excavate around columns to check the injection quality
  • A quick solution:
    Short implementation times and rapid availability of results (less than 48 hours after completion of measurements)

The Principle of Cyljet

Cyljet allows for on-site dimensional verification of injection columns during the construction process.

The solution is based on the Electric Cylinder method and provides 3D investigation around the full circumference of the column.

A multicore cable with evenly spaced electrodes is installed at the center of the column to record and process the potential differences generated by the induced electric current to produce a 3D image of the injected column.

Cyljet can equally be used to validate a test plot, as well as provide continual checking of injection quality as work progresses.

Download the Cyljet Solution Datasheet